Chinese President visit

Prime Minister Muhammad Nawaz Sharif hand shake with Chinese President.

Democracy WINS - Pakistan WINS!

Wall street Journal news about democratic Pakistan

PCEC map

This is the original and only map of PCEC.

Mass Transit Bus Projects

Rawalpindi Metro Project

PM meets King Salman

Pakitan stands beside Saudia for its soverignity

Reduction in fares of public transport

Toll free helpline for compaints

Parliament Gallery

Group Photo| Speaker NA Sardar Ayaz Sadiq with Dr. Cyrill Nunn, Ambassador of Germany and Members of Pakistan-Germany Parliamentary Friendship Group

News reel

Followers

Wednesday, August 21, 2013

Complete text of PM Nawaz Sharif speech on August 19,2013


app63-19pm-islamabad.jpgISLAMABAD, Aug 19 (APP): Prime Minister Muhammad Nawaz Sharif Monday expressed resolve to take difficult and important decisions to improve national economy, eliminate terrorism and address the energy crisis to achieve the goal of a prosperous Pakistan.In his first address to the nation since he assumed office, the Prime Minister vowed not to indulge in politicking on vital challenges confronting the country, that was passing through a very difficult phase and required that the nation stands united.The Prime Minister during his around an hour-long address, aired live on all radio and television channels, touched upon all vital subjects including terrorism, foreign affairs, situation in Balochistan, floods, health, education and the heavy burden of loans that were hampering the progress of the country and impeding welfare of the masses.Prime Minister Nawaz Sharif said Pakistan’s progress cannot be achieved without a stable economy and said it requires resolving the energy crisis and terrorism. It requires that internal and external investment was increased manifold.
He said his first visit to China, soon after coming into power was especially aimed at taking up this issue for finding its solution.  He assured that the Kashgar to Gwadar Economic Corridor will not only change the fate of Pakistan, but also the entire region.
He said the national institutions that once were a source of pride, were now costing an annual loss of Rs 500 billion, while the total national debt has risen from Rs 3000 billion in June 1999 to a whooping Rs 14,500 billion in fourteen years.
Prime Minister Sharif said his government was also committed to provide all resources and cooperation to the elected political provincial government of Balochistan, to bring an end to the killings in the province and to focus on its progress and development.
He said the situation in Balochistan was a matter of serious concern for every Pakistani and everyone has to ponder the reasons that led the situation to such an extent.
He said similarly the lawlessness in Karachi also cannot be allowed to hold the economic and commercial hub of Pakistan hostage.
“Karachi has been a city of lights and peace. Its stature as such must be restored. The federal government is committed to fully help the provincial government in this regard,” the Prime Minister said.
Prime Minister Sharif said he was not satisfied with the working of the existing operational machinery in the country.
“Nothing, whether it is the energy crisis or any other field of operation, Pakistan cannot afford corruption or incompetence at any cost.”
He said he also treats lethargy and inactivity as ailments akin to corruption and now only those officers will be treated with respect and honour who are committed to selflessly serve the masses.
The Prime Minister said in Pakistan’s administrative machinery there was no place for impractical, corrupt and passive officers and workers.
“A rusted machinery like this is not acceptable to me, for the building of a great Pakistan,” the Prime Minister said.
He said he has opened up his heart to the masses and said as a nation “we are part of a family. Whenever there is a difficult time, the whole family stands united.”The Prime Minister said that he had taken oath of office in June and it was his desire to open his heart before the nation without any delay. 
“I wanted to share my intentions and dreams, which I always cherished for the progress and prosperity of the dear motherland,” he added.
He said but when he took over the reigns of the government and observed the situation closely, it appeared that the things were far worse than he had expected. The gravity of the situation demanded that without opting for speeches, priority should be given to putting in place an effective remedy to put a balm upon the sufferings of the country, inflicted during the last fourteen years.
“During the last two and half months, not a single moment had lapsed when I did not think about how to tackle the challenges confronted by the country. Not a single day passed, when we had not put our heads together to devise a strategy to eliminate terrorism, get rid of the load-shedding and other problems,” he added.
The Prime Minister said that they should not shut their eyes to the serious issues being faced by the country. On one hand, the growing menace of terrorism has jeopardized the national integrity, while on the other, the worst load shedding issue has paralyzed the economy.
He said during the last fourteen years, the worst mismanagement, prevalent corruption in every sector, inability, favouritism and flawed decisions had shaken the very foundations of the country.
“Whether it is PIA, Pakistan Railways, Pakistan Steel or WAPDA, or any other institution, all have been on the last verge of destruction and mismanagement. These were the institutions over which once we had taken pride. These institutions, which contributed to the national kitty, are now causing a loss of Rs 500 billion per year,  meaning that during the last five years, these institutions have eaten away Rs 2,500 billion,” he said.
“All this amount is your hard earned money. If such an amount was not wasted, a new PIA and a new railway could have been established. A new motorway from Karachi to Lahore could have been constructed,” he said.
The Prime Minister said for the public, more than two million additional housing units could be constructed, the villages could be provided with the clean drinking water and dozens of universities and hospitals could be constructed. Moreover, with this huge amount, the load-shedding crisis should have been overcome.
He recalled that during 1999 when his government was toppled, Pakistan had a total loans of Rs 3,000 billion, which in the last 14 years, had swollen to Rs 14,500 billion.
He said now it was an irony that for repayment of huge installments of such debt, they were forced to seek more loans and if they did not do so, God forbid, the country could go bankrupt.
He said that he did not want to mention details of yester years corruption because it was not possible to mention it in this speech. 
But he did want to refer to two precedents based upon corruption, senselessness and plunder; these two examples pertained directly to the power generation and load shedding, he added. 
The Prime Minister said that he felt greatly obliged to Almighty Allah while addressing the nation and wanted to express his gratitude to the people for the confidence they had reposed in him and his party. In his view, this confidence was a great responsibility and a sacred trust.
Prime Minister Sharif recalled that the Nandipur Power project was initiated in 2007 with the cooperation of China and billions of rupees were spent on the import of its machinery.
He said it was the time when the masses were facing severe loadshedding and looking for even a single unit of electricity.
He, however, pointed out that this project was halted due to the vested interests of a few people, and the machinery worth billions of rupees was
kept rusting at the Karachi Port. Even the copper of its coils were stolen, and this 425 mega-watts power project faced devastation.The Prime Minister said the present government after coming into power restarted this project without wasting any time. But its cost had increased from Rs. 30 billion to Rs. 59 billion.
So, Pakistan will not only have to spend an extra amount of Rs. 36 billion on this project, but the completion of the project will also face a delay of around six years, he added.
The Prime Minister said the story of Neelum-Jhelum project was also not different, as the 970 mega-watts power project, which was initiated several years back and due to complete in six years time, was delayed.
But the way this project of national importance was dealt with bad administration, carelessness and incompetency, its details are very disturbing, he said. Now Rs. 274 billion would have to be spent on this Rs. 85 billion project.
“I have directed completion of this project by 2016. You would be surprised to know that the transmission system was not included in the project.
When I visited the project site, the people concerned had no answer to this question that how the electricity produced from the project would be transmitted to the people.”
Prime Minister Sharif pointed out that at least three years were required for the project of laying the transmission line. He immediately directed to make laying of transmission line as part of the power project and start the work on it.
“You can imagine that if this step was not taken, even after the completion of Neelum-Jhelum project, the electricity could not be transmitted to the people and factories due to non-availability of the transmission line and the capital of billions of rupees had gone waste,” he remarked.
The Prime Minister while highlighting the steps taken by the government to tackle the energy crisis, said the government had addressed the circular debt issue, which was badly hampering the electricity production by the power producing units not running to their full capacity.
He said despite the country’s worse fiscal situation, the government paid a huge amount of Rs. 480 billion in the circular debt, which led to the addition of around 1700 megawatts to the national grid.
The Prime Minister said one reason behind the loadshedding was pilferage of gas and electricity. According to experts, the volume of this pilferage ranged from Rs 150 billion to Rs. 250 billion per annum. “This is an open dacoity on the national resources.”
He said the present government had initiated an effective campaign against the power and gas pilferers. This drive would continue with full commitment. “Insha Allah, the government will strictly deal with such
people, as the culture of loot and plunder has now ended.”                                                          The Prime Minister told the nation that the government in coordination with all the provinces, had also formulated an energy policy.The consensus approval of this energy policy was a mile-stone in the efforts to address energy crisis.
“Alhamdulillah! the federal government and all the provinces are united and in harmony in addressing the electricity crisis,” he remarked.
The Prime Minister, however, added that he did not want to keep the people unaware of the fact that despite the payment of circular debt, tackling the power pilferage and other administrative measures, complete elimination of the crisis was not possible. To achieve this goal, the resources of power production would have to be augmented.
He said getting the new power production resources immediately was not possible. Three to four years were required for the establishment of coal-fired power producing units, while the hydro-power projects required eight to ten years.                                                                                              “Keeping this in view, we have taken key decisions in this regard,” he added.The Prime Minister said that he would soon give a good news to the nation about the inauguration of 6600 MW electricity projects at Gadani. Similarly, he added, electricity generation from coal at Thar would also be started.
He said such steps would help mitigate the electricity crisis gradually and it would be resolved during the fiver-year constitutional term of the present government.
He said that these steps had been taken during the last nine weeks, which had helped improve the situation to some extent. It was not possible in such a short period if his team had not worked on this sector, he added. 
The Prime Minister said that like the loadshedding, the issue of terrorism was also the result of flawed policies and specific interests. More than 40,000 Pakistanis, including personnel of Pakistan army, security agencies and police, had been martyred in the war against terrorism, he added.
“ Our daughters in several parts of the country could not attend educational institutions, our coming generations are being paralysed by depriving our children from polio drops while our play grounds are anxiously waiting arrival of foreign teams,” the Prime Minister said.
He said that efforts were being made to discourage foreign mountaineers from visiting the beautiful snow-clad mountains.  The Ziarat Residency of Quaid-e-Azam was attacked while the educational institutions and worship places were also not spared.
Prime Minister Nawaz Sharif said the biggest tragedy was that there was no power to stop the criminals from committing such heinous  crimes, to identify them and their hideouts, and give them exemplary punishment under the law.
“What all this is --- Can it be named inefficiency or insensitivity? Whatever it be called, but Pakistan cannot tolerate such situation any more,” the Prime Minister added.
He said the time had arrived to tell the truth to the nation and accept that “our administrative institutions, intelligence agencies and justice system have not proven efficient to fulfill their responsibilities and face the severe challenge of terrorism.” 
He said had timely steps been taken, the bloodshed and explosions would not have spread to the length and breadth of the country.
He said the nation had the right to ask why meaningful and concrete steps were not taken during the yester years to stop this bloodshed.
The Prime Minister said that neither the performance of intelligence agencies was improved to train them according to the needs of the time, nor they were provided with modern equipment.  Nor the coordination system between them was strengthened.
“We should accept the reality that without ending this static situation, control over the growing incidents of terrorism is not possible,” he said and added that the terrorist groups after committing crimes on the roads safely reached their hideouts.
He said if even the terrorists were arrested, and those arresting them were seen frightened. The investigation process required professionalism, personal interest and expertise, but the authorities concerned lacked all these. As a result when the issue was sent before the judicial officers, they also looked hesitant of conducting trials.
The Prime Minister added that the witnesses also felt  terrorized. On the other hand, jails were broken and the terrorists succeeded in escaping.
The Prime Minister said he extended open offer to all the political parties after the general elections to join hands to face the challenges confronted by the country and for its progress and prosperity.
He said his offer for reconciliation was not only for the political parties but it was also for those elements, who unfortunately had adopted the path of extremism.
The Prime Minister said the government had more than one options to deal with the menace of extremism and terrorism but it wanted to adopt the way, which could save the precious lives of  innocent people.
He said the government wanted to resolve this issue through negotiations or it could use force against these elements. All
the stakeholders and institutions were unanimous and united on the mission to end extremism and terrorism from the society.
He said as Prime Minister of Pakistan, every citizen was like his own child. He said he could not carry the coffins of his children every day.
“I too want to end this bloodshedding like every one.”
The Prime Minister said he was fully aware that the dangers to Pakistan’s security were somehow related to the foreign policy. 
He said,”We have to think and analyze the situation that what had been achieved through the foreign policy adopted by the government in the past.”
The Prime Minister said there was a need to review the foreign policy. Without this review the country could not achieve the targets of welfare of the people using the national resources.
He said Pakistan could have become the Asian Tiger if the momentum of progress and prosperity of 1999 could have continued, as its currency was at the top and it had adopted the policies to improve economic activities.
Referring to the Kashmir issue, the Prime Minister said it was a national issue and Kashmir was a ‘jugular vein’ of Pakistan.
He said he wanted the solution of Kashmir like every Pakistani. He said there was a need to keep in mind that without achieving economic stability, Pakistan could not achieve its objectives.
The Prime Minister said it was the responsibility of the leadership of both Pakistan and India to join hands in finding the resolution of issues like poverty and under-development.
He said the wars fought in the past had pushed Pakistan and India many years behind. He said it had been proved and was a reality that progress and prosperity of the countries depended on peaceful relations with the neighbours.
The Prime Minister said the government wanted to have good relations with all the neighbours, including India.
He said Pakistan always gave importance to improve relations with India to ensure stability in the region. The nation supported him on this issue in the recent elections.
The Prime Minister said both the countries should realize that they should not spoil their resources on wars and concentrate on the welfare of their people, fight poverty and diseases.
He, however, added that the whole Pakistani nation along with its armed forces were fully prepared to defend the country at all cost.
The Prime Minister said there was a need to review the policy regarding Afghanistan. “We should get rid of this notion that every one in the world is our enemy.”
He said adopting this philosophy that every one is Pakistan’s enemy, the country could not ignore its responsibilities.
The Prime Minister said, “We have to adopt a policy through which we can be recognised by the world as a new bright face.”
He said on the drone issue, he had already explained his point of view in clear terms. He said these drone attacks were violation of Pakistan’s
sovereignty and integrity, against the international laws and negated the basic human rights.
The Prime Minister said he had categorically conveyed this to  US Secretary of State John Kerry.
He said the Secretary General of the United Nations had also condemned the drone attacks, in which innocent people had lost their lives and clearly stated that these were against the international laws.
He said he hoped that Pakistan’s sovereignty and integrity would be respected.
On the Balochistan issue, the Prime Minister said it had become a very serious issue for every one.
He said innocent people were being made victims by those, who were playing with the lives of common people.
Prime Minister Nawaz Sharif said the Pakistan Muslim League-N despite in a position to easily form its government in Balochistan, decided to ‘let it go’ in the best national interest. 
He said he valued Balochistan’s governor as the governor from  his own party and had the similar regard for the governors of other provinces.He also expressed full support for the Pakistan Peoples Party’s government in Sindh. 
He mentioned several meetings with the governors and chief ministers of Sindh and Balochistan and mentioned the offer of the federal government to undertake development projects in Thar and Gaddani.
He said the government was concerned over the law and order situation in Karachi and hoped that the provincial government would take steps to rid the country’s largest economic hub of terrorism.
Nawaz Sharif said he had the desire that Karachi might become a prosperous city and expressed his wish to jointly lay the foundation-stone of a metro rail system in the city along with the Governor Sindh.     
The Prime Minister said despite support to the provinces, the federal government would remain strict on the issue of corruption.
He asked the provincial governments to follow the policy of merit and warned that notice would be taken on complaints of corruption.
The Prime Minister stressed that the country’s development was not possible without a strong economy. He termed local and foreign investment as vital for achieving stable economic conditions in the country.
He said the purpose of his recent official visit to China was to attract investment and to help the country overcome the problem of electricity shortage. 
He said the government was focusing on installation of several power plants across the country. 
The Prime Minister mentioned a number of memoranda of understanding and agreements signed with of China on development projects in diverse fields.
He termed the project of Gwadar-Kashgar motorway a ‘game changer’ that would give a boost to the regional economy.
He said the project would lead to the establishment of economic zones and help end unemployment in Pakistan.
He said the project, in particular, would result into speedy development of Balochistan, Khyber Pukhtunkhwa and Gilgit Baltistan in addition to Punjab.
The Prime Minister said the construction of motorway between Karachi and Lahore would be a good news for the people of Sindh and Punjab, who would witness development in their areas.
He said he wanted to expand the network of motorways across the country and extend it to the Central Asian states and the SAARC countries for the benefit of maximum people in the region.The Prime Minister commended the nation by saying that he had seen the fervour of people during the elections and the affection they had expressed for him, could not be forgotten.
He said that he wanted ample opportunities for the youth to play their role in the progress and prosperity of Pakistan and the government had decided to adopt such a policy enabling them to earn the living themselves.
He said that he would soon announce details of a programme for the youth.
The Prime Minister said they wanted to steer the nation out of the clutches of poverty and backwardness as he wanted maximum members of each family to become earning hands.
“I want to convey a good news on this occasion, we have prepared a scheme of affordable housing units for the low income families. Everyone knows that provision of a shelter to himself and his family is the dream of each person. We have decided to materialize this dream.”
Prime Minister Sharif said, “I announce with much pleasure that during the upcoming five years, thousands of homeless people lacking in means and belonging to all the provinces of Pakistan, will become owners of their houses. Insha Allah, I shall announce details of this scheme this year.”.
He said that he also wanted to mention that their thinking and endeavours were not only limited to the terrorism and load shedding issues. 
He along with his team had been striving hard to find ways to rid Pakistan of all the problems. These issues also included the minorities’ issues and empowering of womenfolk, he added.
Prime Minister Nawaz Sharif said that he had realization of issues related to health, education, drinking water and other daily matters. Though majority among them belonged to the provincial governments but he would timely keep the nation abreast of all the planning of the federal government for their resolution.    
He also sought solid suggestions and proposals from the people.
The Prime Minister also specially mentioned the flood affected populace and maintained that the federal government would help them at all cost.
The provincial governments were expected that they would not exhibit any slackness in meeting the requirements of the flood affected people by providing them shelter, food and medicines, he added.
“I appeal to all the nation to lend support to the calamity-hit people by following their great Islamic and national traditions.  We have to express our complete national fervour and unity in this hour of trial,” he added. 
The Prime Minister reminded the nation that with mere aspirations, they could not achieve anything. 
“The path to prosperity and development demands sacrifices and his heart bears testimony that despite such huge hurdles, shortcomings and weaknesses, they can build Pakistan, which is reflected in their hearts,” he added.
But for it, they have to gird up their loins, overcome their shortcomings and weaknesses and sacrifice for a brilliant future, he said. No doubt, issues were enormous, but not greater than their spirit of faith. The path might be difficult, but not enough to overshadow their strong intentions.
He said that the destination could be far away but they bore the qualities of courage, passion and a strong will.
He said that he believed that a Pakistan aspired by the Quaid-e-Azam and Allama Iqbal was entering into a new bright era and he had a firm belief that the darkness of backwardness would soon diminish and the sun of prosperity would dawn upon the country.
“My heart bears testimony that the blood of Shaheeds, who have laid down their lives for Pakistan, will bear fruit,” he said.
Prime Minister Sharif urged the nation to face the difficulties boldly and tread the path to new horizons as they have the blessings of Almighty Allah and the Holy Prophet (PBUH).
  
 

Column |

The turn of Fortune


This column was published in Daily Nawai Waqt dated June 10, 2013


News Report

CM inaugurated Solar PP in Cholistan


This news report was published in Weekly Nidai Millat dated August 08-14, 2013


Tuesday, August 20, 2013

Column |

Amjad Islam Amjad


This column was published in the Daily Express dated February 14, 2013



Friday, August 16, 2013

Interview |

Chaudhary Jaffar Iqbal


Published in Weekly Nidai Millat dated August 08-14, 2013





Sunday, August 11, 2013

Shahbaz's SUNSHOT

The beginning of Solar PV Generation era in Pakistan 

Written by Engr. Hadeed Sher


Shahbaz Sharif's latest shot to the sun is tremendously awesome in terms of investment, job opportunities and curbing the power crisis. It reminded me the slogan which J F Kennedy gave to US nation "The MOON SHOT " that was the most important event in the lifetime of NASA. Shahbaz's SUNSHOT or the shot to the sun is about the harvesting of solar energy to get rid of the present energy crisis. It was indeed pleasant to hear that a lot of MoUs have been signed with various organizations of international repute to install generating plants based on solar energy. Since, harnessing energy from sunlight was area of research during my Post graduate degree and fantastically & luckily I got my doctoral research grant in the same field, I feel it is the right time to discuss the Shahbaz's SUNSHOT.


Pakistan has unfortunately been among those countries that never bothered to work with planning. Most of the institutions never recognize the importance of planning neither at departmental nor at ministerial level. This resulted in the depletion of natural resources and now we are spending a sizable amount of our budget on the import of petroleum products. This has several disadvantages in the wake of the feeble economy of Pakistan. Firstly, with the passage of time, the consumption of furnace oil for electricity production is not going to be decreased because so far the governments have failed to build consensus on major projects for water storage and electricity generation. The construction of dams requires time and a huge capital cost. Therefore, some of the easy solutions that our bureaucracy have, is to install thermal power plants or purchase it from neighboring countries like Iran or India. Therefore, we cannot expect to have the total production ratio tilted away from the thermal power generation in the next few decades. Secondly, the disadvantage is that with the fluctuating prices of petroleum products in international markets it is not possible for our government to make the utility prices stable. I am not an economic expert, but it's obvious that a rise and sometimes a fall in the petroleum prices shakes the economy of an ordinary man like a corn seed inside the popcorn machine. Thirdly, these resources are not infinite, some studies have mentioned that we will no longer be able to use this petrol as a fuel or as a source of electricity generation after 100 years. They are depleting fast and we should think about our future generations and we cannot just leave our future on these dependable resources.


So where lies the solution ? The question is as difficult as it seems to be simple. Meaning, we have to look for resources that are sustainable. Resources that last long and can safeguard the future of our generations. The available options are wind, solar, tidal, geothermal and hydal etc. However, solar and wind are the two most dominant technologies. ON shore and Off shore wind plants are considered the most economical but thanks to saeen Qaim Ali Shah sb. who has no interest in whatsoever is known as electricity generation. Anyhow, the Pakistan's vast land on its southern part has an abundant amount of sunlight available almost throughout the year that can be utilized for electricity generation. Although the program for harnessing solar PV was initiated long ago in Bhutto's regime, that was converted into PCRET by Musharraf, nothing serious has ever been done in this regard. While in India they are manufacturing solar PV modules, we are yet in a mood to decide how to cope with the growing energy demands. The most important step taken by CM Shabaz  is the establishment of manufacturing facilities of solar PV modules in Pakistan. Another one is the establishment of Quaid e Azam Solar energy park for generation of 300MW from a solar PV system in CHOLISTAN. Then another project for setting up of 400 solar power projects for industrial zones in Faisalabad, Sialkot, Gujranwala and Lahore. Another project will be set up in Faisalabad, Motorway and it will be 150MW. The Shahbaz's sunshot is not only limited to PV power plants but will also benefit the agriculture sector through solar pumps. The Punjab Irrigated Agricultural Productivity Improvement Project will also benefit the farmers by solar powered tube wells. The lighting load that normally covers around 10 percent of the total load will be gradually shifted to solar street lights.

These steps will not only help in curbing the power crisis but will have long lasting effects on national economy too. These projects will directly and indirectly provide employment to thousands of skilled workers and engineers and will save Millions in term of import bills of furnace oils. Besides these steps, the provincial governments of Baluchistan and Sindh should focus on the generation of electricity through OFF shore and Onshore wind plants. In my opinion the crime rate can be subsided greatly by providing the job opportunities and they relate directly to the uninterrupted supply of power to the industries. On a side note, we need to look on some other dimensions of the energy crisis that includes separate engineering discipline for energy generation, known as Energy Engineers. Special programs must be initiated that urge people to save electricity because a unit saved is actually a unit generated.


Wednesday, July 31, 2013

Rare Photographs

Pakistan Muslim League (Nawaz)













Tuesday, July 30, 2013

Interview

Raja Ishfaq Sarwar


This interview was published in the sunday magazine of Daily WAQT dated July 28,2013








Sunday, July 28, 2013

Investing in Dreams

Investing in Dreams

Dr. Umar Saif 
Sunday, July 28, 2013 
 

As my car enters the posh surroundings of the Arfa Software Technology Park, I notice a plainly clad girl getting off a rickshaw and briskly walking towards the entrance. The spring in her step belies the haste with which she wants to reach her destination. Maybe she is late for a meeting; maybe she doesn’t want to be seen getting off a rickshaw in these posh settings. As we enter the lift together, I instantly recognize her. Sidra is one of the young entrepreneurs in the startup incubator setup by the Punjab Information Technology Board (PITB), called Plan9. Sidra, along with her co-founder, Waqas, founded an Internet e-commerce service last year and started selling handmade leather shoes to the world from a warehouse in Okara. Hometown now employs 11 people and uses technology to scale a traditional handicraft business in Pakistan. Two months ago, they closed a deal with Fab.com (world’s top ecommerce store), with customers in European and US markets. Sidra’s company, Hometown, is one of the 30+ IT startups housed in Plan9. Each startup in Plan9 is working on an innovative IT product ranging from fun mobile games to hardware gadgets. However, there is one thing all these entrepreneurs have in common: ambition. No one joins Plan9 to start a “respectable” company with a few thousand dollars in monthly revenue. Instead, every entrepreneur in Plan9 is pushed to work towards a dream of launching the next Google or Facebook from Pakistan. Government of Punjab, through Plan9, is investing in these dreams. Plan9 provides free, furnished office space in the Arfa Technology Park, laptops, stipends, administrative and legal help, training, funding for travel and access to world-class mentors and investors. The program is structured such that entrepreneurs can walk in with an idea and walk out with a company. Even though Plan9 is the first organized effort by the government in Pakistan to setup an incubator, such facilities are not uncommon in other countries. Seoul has over 300 incubators in one city; many successful companies in US have come out from famous incubators like the Y-Combinator and techstars; countries like Estonia (with the highest number of startups per head in Europe) have many successful incubators that have helped it leapfrog other countries in high-tech entrepreneurship. Another example is Israel, a country, with its successful startup ecosystem, which has produced more NASDAQ listed companies than all of Europe combined! Even one startup like Skype, founded by two young entrepreneurs in Sweden and sold for $8.5 Billion, could be a game changer for Pakistan’s economy. Our entrepreneurs have not disappointed us. Many started turning profits and attracting investments within our six-month incubation cycle. Others learnt the art of constructive failure and made something out of absolute nothing. PeerCloud, company with a struggling product plugged away to pair up with a VC from Khosla Ventures (one of the top Venture Capital firms in the Silicon Valley) who they met through Plan9. Another startup Eyedeus Labs was recently featured by TechCrunch and Gizmodo. Eyedeus Labs is also among the eight lucky startups from around the world selected by Google for Entrepreneurs to attend this summer's Blackbox Connect. At the same time, Plan9 has put together an Angel Investor Club, where successful businessmen in Pakistan get together every few weeks to evaluate Plan9 companies for possible investment. Already grown to a size of over 15 members, this group has also provided us an opportunity to develop a legal and corporate framework for investments in technology companies. In the absence of organized venture capital in Pakistan, we have started looking at governmentsponsored models like SBIC (Small Business Investment Company) in US and Yozma program in Israel to kickstart a VC industry in Pakistan. We believe that Hightech entrepreneurship can be one of the key enablers of our economy. If we can provide the right ecosystem, Pakistan, with a population of 200 times that of Estonia, can be a hub of startups. Statistically, it’s just a matter of time before Pakistan produces a Google or a Skype. And we, at Plan9, will not settle for anything less.




Power generation: Punjab government, China to invest in Balochistan

Power generation: Punjab government, China to invest in Balochistan


LAHORE: The government of Punjab has signed a Memorandum of Understanding (MoU) with China Power International (CPI) Holding Limited, a private company, to generate 2,400 megawatt (MW) electricity in Pakistan within the next two to three years.
Speaking to the media, Punjab Chief Minister Shahbaz Sharif said that the MoU was pure investment through which two partners will establish four coal-fired power plants. The plants, which will be set up in the Gadani area of Lasbela district, will produce 600MW each.
Sharif said that coal will be imported to Gadani and the 2,400MW will be shifted to the National Grid Station to distribute power across the country. He said that the MoU was signed within 25 days after he along with Prime Minister Nawaz Sharif had called on the management of CPI during their China visit.
The Punjab chief minister said that the first plants producing 1,200MW will be finalised in two years and the next two in 48 months.
Sharif did not disclose how much was being invested by Punjab and CPI Holding, but said that his government had a “little share”.
When asked if the Balochistan government had been taken on board for the project, the Punjab chief minister replied in the affirmative and said that the people of the province should be happy as China and the Punjab government were making a big investment in Balochistan. He also said that all issues related to the project will be dealt with according to the constitution.
Balochistan is considered to be unsafe for Chinese engineers. The area of Gadani is roughly one hour drive from Karachi and has a Baloch population of roughly 20,000 people.
CPI Holding Limited is a holding company operating through the China Power International Development Limited subsidiary, which owns and operates power generation, transmission, and supply plants. The company is based in Wanchai, Hong Kong.




Friday, July 26, 2013

Recruitment of 72,000 educators approved by Punjab CM

Recruitment of 72,000 educators approved by Punjab CM




LAHORE: Punjab chief minister Shahbaz Sharif has accorded approval to the recruitment of 72,000 educators in public schools of the province during next two years in addition to 80,000 educators recruited in the last fiscal year.

This step has been taken to ensure successful campaign for 100 percent enrollment in schools under enrolment emergency to be started from August 14 this year which requires more and more teachers to meet the expected phenomenal increase in the number of students throughout Punjab.

This was disclosed by Provincial Minister for Education Rana Mashhood Ahmad Khan while presiding over a high level meeting in connection with Punjab Schools Reforms Roadmap, here on Wednesday. Additional Chief Secretary Mirza Sohail Amir, Secretary Higher Education Farhan Aziz Khawaja, Secretary Schools Education Abdul Jabbar Shaheen, MD Punjab Education Foundation Ambreen Raza, Chairman Punjab Text Book Board Nawazish Ali, Project Director PMIU Imran Sikandar Baloch, Project Director DSD Nadeem Kiyani, representative of DFID Barbra Paye, Javed Malik, representative of World Bank Umbreen Arif besides Taimur Khan of MCK and Hina Khan of McKinsey attended the meeting.

Rana Mashhood Ahmed Khan said that the Punjab government would surely achieve the Millennium Development Goals (MDGs) of the United Nations (UN) more efficiently as compared to other provinces of Pakistan. The educationists from Punjab will play an exemplary role to accomplish this gigantic task, he added.

He revealed that 74 percent kids of the age of five to nine years were studying in primary schools of the province, according to a survey conducted by PSLM Data of the Federal Bureau of Statistics in 2011. It is heartening to learn that this ratio has increased to 87 percent enrolment in June 2013 according to Neilsen house hold survey which is a third party enrolment data.

The minister expressed dissatisfaction over the fact that the dropout rate after enrolment of the kids was as high as 38 percent just after one year of their first enrolment in Montessori level.





Punjab signs MoU to set up manufacturing plant of solar panels

Punjab signs MoU to set up manufacturing plant of solar panels

 

LAHORE: A Memorandum of Understanding (MoU) regarding solar development project was signed between the Punjab government and an international consortium of five countries, including Switzerland, Germany, Italy, Austria and Pakistan, at the Chief Minister’s Office, here on Wednesday.

Punjab Chief Minister Muhammad Shahbaz Sharif, Energy Minister Sher Ali Khan, Secretary Energy and senior officials of departments concerned were also present.

Secretary Energy Usman Bajwa and Chief Executive Officer and Group Chairman of Swiss Company STCS AG Rainer Kertess signed the document on behalf of the Punjab government and the international consortium. respectively. Under the agreement, the international consortium would set up a plant of assembling and manufacturing of solar panels, solar cells and batteries in Faisalabad. The consortium would also consider the project of setting up 400 solar power projects each near industrial zones in Faisalabad, Sialkot, Gujranwala and Lahore while a 150-megawatt power plant would be set up along the motorway from Pindi Bhattian to Faisalabad.

The consortium will also introduce solar pumps for agriculture sector in Punjab, street lights in big cities of the province and those installed at Ring Road will be gradually converted to solar power. The consortium will also consider introduction and implementation of zero energy building system for large buildings besides evolving a project of supply of off-grid energy to industrial zones.

Speaking on the occasion, Chief Minister Shahbaz Sharif welcomed the signing of the agreement between the Punjab government and international consortium and said that measures would be taken for the early implementation of the agreement in a transparent manner. He said that the Punjab government would provide all possible facilities to the international consortium. He said that nothing could be more important than solution of energy crisis, he said, therefore the Punjab government was implementing a comprehensive programme of encouragement of foreign investors.

The croup chairman of the consortium said that his group was interested in making heavy investment in solar energy sector in Pakistan, especially Punjab and the agreement would promote investment in the province.

Earlier, representatives of the international consortium met the chief minister and gave him a briefing on cooperation in solar energy sector. 





Monday, July 22, 2013

Saad gives a push to Railways

Saad gives a push to Railways


Monday, July 22, 2013 - PAKISTAN Railways has launched its third goods train to accelerate the freight operations and increase revenue generation. The operation of the train reflects that Railways has started moving once again and with the passage of time not only more freight trains would be introduced but the entire system would be revamped.

We see the light at the end of the tunnel because soon after taking the rein of railways Ministry the young and vibrant Minister Saad Rafiq is spending his entire time on going through the ills in Railways and how to get the very important source of transportation out of the mess. He is visiting different departments and inspiring the workers and officials to restore lost glory to Railways. With the launch of the train and almost no significant report of failure of engines, over the past one month, one can say that the Minister has given a push to the Railways. Once upon a time, Pakistan Railways was a fascinating, cheap and most secure system of transportation all across the country and its network strengthened the federation. But with the passage of time and total apathy of the successive governments, scar of unionism that developed culture of wheeljam, overstaffing and theft of assets and corruption took the railways to almost its ultimate destination of junkyard. The last blows were terrorist related incidents destroying its tracks and land mafia that occupied the precious land bringing it to a virtual standstill. During the last two years of the previous government, there were daily reports of breakdowns of engines, non-availability of fuel and even disconnection of electricity at railway stations due to financial bankruptcy. But we hope that with sincerity of purpose, the Minister will continue with the same zeal and fervour to put the PR back on rail and make it the popular mean of transportation by utilizing the indigenous resources of the organisation in-cluding the Risalpur locomotive factory, Mughalpura work-shop and Islamabad Carriage factory to name a few.