Chinese President visit

Prime Minister Muhammad Nawaz Sharif hand shake with Chinese President.

Democracy WINS - Pakistan WINS!

Wall street Journal news about democratic Pakistan

PCEC map

This is the original and only map of PCEC.

Mass Transit Bus Projects

Rawalpindi Metro Project

PM meets King Salman

Pakitan stands beside Saudia for its soverignity

Reduction in fares of public transport

Toll free helpline for compaints

Parliament Gallery

Group Photo| Speaker NA Sardar Ayaz Sadiq with Dr. Cyrill Nunn, Ambassador of Germany and Members of Pakistan-Germany Parliamentary Friendship Group

News reel

Followers

Showing posts with label Hydalpower. Show all posts
Showing posts with label Hydalpower. Show all posts

Wednesday, October 3, 2012

Better Pakistan | Power generation projects

Better Pakistan | Power Generation Projects (Part II)


In the first part the efforts of PMLN for electricity generation was discussed and it was stated that the efforts of present PMLN government in Punjab(2008-date), will be discussed. So here in the coming lines we will present the efforts of Punjab Govt. in meeting the demands of electricity to the people of Punjab.

On 19th April 2010, NA of Pakistan passed the 18th amendment in constitution of Pakistan. According to that amendment several departments were transferred to provincial govts. Among those departments are the power generation department. Most of the opponents in this regard consider Punjab Govt. or in other words Shahbaz Sharif responsible for the load shedding in Punjab. For them it was an agreement between one person and another to handover few papers. However, practical politics is very much different with the social media based politics. 

It happened unfortunately that even after the 18th amendment the working procedure and the shifting of departments was not a step function. It was a linear function with a poor slope. Departments were shifted with an intentional delay to deepen the crisis. Furthermore, several important parameters that are required by the investors are controlled by the federal Government. The fact that any investor requires a sovereign guarantee for investment, can only be provided by the Federal Govt. and the fact that the National Electric Power Regulatory Authority (NEPRA) is responsible for electricity tariff comes under Federal Govt. were  overlooked in the objections of the opponents. Its not because the opponents intentionally igonred these circumstances, its because as a nation we always want to  sparkle our political face by throwing mud on the efforts of other parties.  Remembering one title of a column by the de jure spokesman of PTI "زندگی اپنے محاسن پہ بسر ہوتی ہے اوروں کے عیوب پر نہیں "

Considering this brilliant advice we in the forthcoming lines will present the work done by PMLN during its tenure from 2008-2012 in Punjab. Using the available space and time,  as and when required, we will also try to recap the work done by the previous tenures of PMLN.

Story begins :

After the 18th amendment it was desired to set up organization to carry out the power generation projects. For this purpose an independent department was established which is known as Energy Department. The aim of this department is to pursue for power generation and oil and gas projects within Punjab. The functions of energy board are given here. This authority/department is responsible to design and inspect the work under the several acts related to power generation. The regulation of electric power is controlled by the Regulation of Generation, Transmission and Distribution of electric Power Act, 1997. Similarly for controlling the theft of electricity PMLN govt. in 1998 presented an ordinance. This ordinance is known as Offences in Respect of Electricity (Emergency Provisions) Ordinance, 1998. After establishing the basic department for the regulation of power generation, the Punjab department of Energy announced the revised version of energy policy 2006 in 2009. This policy formed the guidelines for the implementation of power projects through Punjab Power Development Board. This revised policy covers the power generation projects in public and private sectors. It also covers projects that are through private-public partnership.

The  proposed schedule given in revised energy policy for tariff approval from NEPRA is 60-180 days.  It is worth mentioning here that this regulatory authority was also established under the PMLN government, which passed NEPRA ACT in 1997. The energy department of Govt. of Punjab worked day and night under the command of Chief Minister Punjab to develop annual energy plan and strategy. The efficient work of PPDB is evident from the fact that within its budget capacity it has scheduled 35 projects. These projects together are able to inject 254.24 MW in the national grid. One project is run of water. The detail of these projects are given here. All projects are scheduled to be finished by 2014. May be someone else will be cashing our projects just like Gen. Musharraf spent his time by cashing the work of PMLN. 

On Sept. 15, 2011 Punjab Assembly passed an Act known as THE PUNJAB POWER DEVELOPMENT BOARD ACT 2011. It was assented to by the Governor of the Punjab on September 30, 2011; and, was published in the Punjab Gazette (Extraordinary), dated 3 October 2011, pages 37367-71. This act formed the basis for the for the establishment of the Punjab Power Development Board for the implementation of policies of the Government to facilitate the private investors in power sector and to harness the energy generation resources in the province.

For the first time in the history of Pakistan nontraditional methods of power generation are initiated by the PMLN govt. These projects include
  1. Biomass projects
  2. Waste to energy projects
  3. Biogas power projects
  4. Solar power projects
The Punjab govt. has planned spent more than PKR 88k Million till 2014. The development budget of Punjab Energy department is PKR 9000 Million in the year 2011-12. The detail of the  development budget can be seen in Annex-2 of annual plan of energy department of Punjab.

It is also worthy to consider the failure of Nandipur power project (425 MW). The Nanidpur power project is a perfect example of the selfishness and mismanagement of federal govt. The machinery required for the establishment of this power plant was intentionally halted at the Karachi port despite of the sue moto action taken by the Supreme court of Pakistan. The machinery was kept at Karachi port on the name of legal complications for 2 year, after all it was to be used for the people of Punjab and PMLN was the one who had a contract with the Chinese company. On Sept. 8,2012 it was reported on local newspaper that Chinese have cancelled the said project because of the delays in the commencement of the project.

The govt. of Punjab has also started the Renewable Energy Development Sector Investment Program under the ADB Loan No. 2286-PAK . Various projects under this program are shown in this report and in the figure below.


The location plan for Okara hydro power project is shown below (Source: Renewable Energy Development Sector Investment Program (REDSIP)).


Similarly, under the same program Marala Hydro Power Project worth 7.64 MW and Pakpatan Hydro Power Project worth 2.85 MW is also in progress. The initiatives of PMLN lead Punjab Govt. for power generation are given below [Reference: Punjab Power Management Unit].

  • Part-A:    Construction of five HPPs   (OCR Loan 2286-PAK)
    • Construction of Marala HPP (7.62 MW) RD. 2+850 UCC, Distt. Sialkot
    • Construction of Deg Out-Fall (4.04 MW) RD.282+340 UCC Distt. Sheikhupura
    • Construction of Pakpattan (2.82 MW) RD.112+350, Pakpattan Canal
    • Construction of Okara (4.16 MW) RD.199+000 LBDC, Distt. Okara
    • Construction of Chianwali (5.38 MW) RD.130+000 UCC Distt. Gujranwala

  • Part-B:   Feasibility Studies of additional five HPPs (OCR Loan 2286-PAK)
    • Lower Chenab Canal (LCC), (7.55 MW), RD. 0 +000       
    • Khanki Barrage   (KB), (14.9 MW), Right Bypass
    • Qadirabad Barrage (QB), (23.00 MW),   Right Bypass
    • Upper Chenab Canal (UCC), (3.58 MW),   RD. 133+ 296
    • Qadirabad Balloki Link Canal (QBLC), (7.68 MW),   RD. 304+985

  • Part-C Capacity Development of Energy Deptt.    (ADF Loan 2286-PAK))
    • Construction of office complex of PPDCL and Allied entities of Energy Department.
    • Management Consultants for Office Complex Building.
    • Capacity Development through Consultants, seminars, local/foreign training
We hope that the cultivation of these projects should be made by the founders PMLN, not by some one else like it happened in the past that the incompetent Parvaiz Elahi and co. spent their 5 years tenure on the projects designed by PMLN.

The Punjab Energy department has formulated the strong case of Punjab on their website, which is  presented below (Red colored text) for ready reference.


Punjab Energy Scenario:
An Overview of Energy Scenario in Punjab
Brief Facts

Ø       Punjab contributes 65 % of GDP
Ø       Punjab contains 60% of all industry with more than 48,000 units
Ø       Punjab consumes 62% - 68% of the total national consumption of electricity
Ø       Punjab currently faces shortfall of electricity around 3300 MW
Ø       SNGPL is facing shortage of 700 MMcfd
Ø       CNG stations across the province are closed for 3 days a week
Ø       6-18 hours of power load shedding during peak demand is a norm in urban and rural areas
Ø       Severe Gas shortages
Ø       DISCOs located in Punjab not only have low distribution losses but their revenue collection efficiency is better than the DISCOs located in other provinces (Annex 1). Thus the province of Punjab ends up subsidising the losses of other provinces both financially and in terms of load-shedding
Ø       Despite being the largest consumer of power and gas, Punjab has no control over quantum, duration and usage of either gas or power
Ø       Energy Department has facilitated and initiated more than 55 power generation projects in public and private sector with combined capacity of more than 1300 MW
Electricity Demand and Consumption (Punjab) – 12 Jan 2012

DISCO

Demand (MW)
Supply (MW)
Shortfall (MW)
LESCO

2500
1500
1000
FESCO

1250
800
450
IESCO

1468
927
541
GEPCO

1221
789
432
MEPCO

1678
761
917


8117
4774
3340
Ø       Electricity Consumption in Punjab is 62% - 68% of the total national consumption 
Gas– Demand and Supply – Jan 2012

Entity
Demand – Million CFt per day
Supply – Million CFt per day

Shortfall MMCFD
National
5000

3800
1200
SNGPL
2625

1925
700

Ø       CNG Stations across the province are facing three days a week closure

System Efficiencies


  • The above table indicates that DISCOs located in Punjab not only have low distribution losses but their revenue collection efficiency is also much better than the DISCOs located in other provinces. Thus the province of Punjab ends up subsidising the losses of other provinces both financially and in terms of load-shedding.
  • Currently, PEPCO receivables stand at Rs. 284 billion out of which receivables against the Government of Punjab are only Rs. 6 billion, however, Punjab is facing proportionally more load-shedding as compared to other parts of the country.

 Implications for Punjab
Punjab is the worst affected province:

  • 6-18 hours of power load shedding during peak demand is a norm in urban and rural area.
  • 3-4 days gas load shedding in Punjab
  • Serious negative implications for Punjab of Constitutional provision that the province in which a well-head is natural gas is situated shall have precedence over other parts of Pakistan in meeting requirements from a well-head.
  • Most of the industry is running on 40 to 50% capacity resulting in large scale lay-offs and unemployment with serious law & order and social implications
  • Despite being the largest consumer of power and gas, Punjab has no control over quantum, duration and usage of either gas or power
  •  Several industrialists have threatened to move out of the province if their gas supply issue is not resolved.
  • Textile production in the province has dropped 25 per cent in textile sector owing to the gas shortage.
  • Hundreds of thousands workers have become unemployed as a result.

There are arguments that might come against PMLN but the facts must be liberal in nature. The fact that the federal govt. is controlling the power flow in national grid through federally administrated PEPCO and the tariff decision is not in the control of  Punjab govt. is evident that who is actually responsible for the failure of Nandipur Power Project of PMLN lead Punjab Govt. The unjustified load shedding schedule specifically designed for Punjab to fan the flame of hatred against PMLN. It should be noted that the distribution companies in Punjab have impressive recovery rate. The industrialists of Punjab are becoming the victim of PPP govt. The anguish of those who have been severely affected by the load shedding is destabilizing the economical situation of country. However, we do not claim that we are prefect but it is also not justified to claim that Punjab govt. is responsible for power outages in Punjab.


Wednesday, August 8, 2012

Better Pakistan | Power Generation projects

Better Pakistan | Power Generation Projects (Part I)


Electrical power being an integral part of any country is a vital need for any good governance. The load forecasting and the establishment of new power projects are thus an important requirement for any rising economy. Recent power outages in our country have shown that the shortfall of the electricity is actually a mare failure of the previous governments who never tried to cope with the growing demand of electricity. The shortfall of electricity further enhanced by the economic policies of present federal govt. who has not yet started any major power generation project.

PMLN being the largest rightest party in Pakistan have always focused on poverty elevation using industrial revolution. This way country not only gets revenue but it also decreases the unemployment ratio. Since industrial revolution is proportional to the energy supply and demand therefore in the two tenures of PMLN we put our best to supply an uninterrupted power to the industrial as well as domestic users.

Without going into the details of what previous governments have done to increase the power production capacity, we as a party have enough to show that all major power projects have PMLN signatures on them. We are proud to stand in front of nation with projects that are serving this nation in the best possible way.

Our Milestones in Power Generation Arena 

As a pro people government during 1990-92 and 1997-99, PMLN was fully aware of the ill fated contracts signed by PPP government with Private independent power producers (PIPPs) during 1993-96. The contracts were signed at higher per unit rates compared to the affordable rates. The irony was not limited to the high tariff  but some companies were charging much higher than what they were charging in neighboring countries. This was an extra burden on GoP, therefore, PMLN govt lead by Mian Nawaz Sharif (1997-99) decided to negotiate with the IPPs to bring their tariff down. It was not easy as the companies were given guarantees from national as well as international organizations. In such effort 17 power companies agreed to bring their twerrif 30-50 % down of the contractual value. The Govt. also found irregularities in the contract of two companies and cancelled their contract thus saving an amount of PKR 15 Billion. A newspaper clip dated 5th of June 1998 is shown below for reference.



In order to create a competitive and liberal atmosphere for investment in power sector PMLN took following major steps.
  1. We did the restructuring and privatizing of the existing thermal power generation, the power transmission and distribution functions and assets of existing public sector utilities (WAPDA/KESC).  
  2. PMLN  created a fully autonomous regulatory authority, the National Electric Power Regulatory Authority (NEPRA). The NEPRA act was approved by parliament and signed into law in December 1997. The main aim of NEPRA was to create an autonomous, independent regulatory authority, which will be solely responsible for the power sector
  3. Other than this, PMLN while sensing the importance of power generation through IPPs, approved the power policy 1998 . The main points of this policy are given below.
  • The basis for selection of private power project will be minimum levelized tariff through International Competitive Bidding.
  • The process of selection will involve pre-qualification, issuance of a Request for Proposals (RFP), bidding and evaluation of bids against bid criteria clearly laid out in the RFP.
  • Detailed feasibility studies for every project will be prepared before bids are invited.
  • Hydel projects will be implemented on a Build-Own-Operate-Transfer (BOOT) basis; to be transferred to the province in which it is situated at the end of the concession period, and thermal projects on a Build-Own-Operate (BOO) basis.
  • The new Power Policy framework being proposed now is based on setting a tariff as a result of a competitive process through which private sector entrepreneurs will be invited to offer the lowest tariff per kWh for delivered energy.
  • The GOP will guarantee that the terms of executed agreements, including payment terms, are maintained during and after the transition to the private sector companies that result from the system restructuring described above. 

Major Power Projects 

The main power projects that were installed during two tenures of PMLN are following

CHASNUPP-1


The construction of Chashma Nuclear Power Plant Unit-1 (CHASNUPP-1), the second nuclear power plant in Pakistan, was started in 1992 with the help of People's Republic of China. It has an output of 325MW and has a life span of 40 years. (http://www.paec.gov.pk/chasnupp1/)

Ghazi Brotha HydroPower Project


The project is based on the utilization of the head available in the Indus River between Tarbela dam near Ghazi confluence with the Haro River and the Indus River near Barotha. It has  a peak power capacity of 1450MW. The feasibility of this Hydral power project was completed in 1992 during the first tenure of PMLN (http://www2.adb.org/Documents/PCRs/PAK/pcr-pak-26409.pdf).

Other than the above mentioned huge projects three new units each of 432 MW were installed at Tarbela that uplifted the installed capacity to a total of 3478 MW. The feasibility study of GolanGol hydro power project (106 MW) was also carried out during the tenure of PMLN. According to WAPDA feasibility study completed by HEPO/GTZ in 1997 which was later updated in 2005. 

IPPs Commissioned 


Power generation by IPPs also boasted during PMLN tenure that reflects the investment friendly policies of PMLN. The IPPs that were given contract / commissioned during PMLN tenures are given below (http://www.ppib.gov.pk/N_commissioned_ipps.htm  http://www.pepco.gov.pk/ipps.php )
  • Hub Power Project 1200MW agreement in 1992, commissioned on March 31, 1997 
  • Kohinoor Energy Power Project 126 MW commissioned on 20th June 1997
  • Gul Ahmed Power Project 125 MW commissioned on 3rd Nov, 1997
  • Tapal Energy power project 120 MW commissioned on 20th June 1997
  • AES lalpir Power Project 350 MW commissioned on 6th Nov, 1997
  • AES Pakgen Power Project 350 MW commissioned on 1st Feb,1998
  • Habibullah Coastal Power Project 126 MW commissioned on 11th Sept, 1999
  • Southern Electric Power 119 MW commissioned on 10th March, 1999
Three other IPPs that were worked by PMLN but later commissioned during the martial law of Gen. Musharraf . These are also listed below (http://www.pepco.gov.pk/ipps.php)
  • Fauji Kabirwala 151 MW commissioned on 21st Oct, 1999
  • Rousch Power 395 MW commissioned on 11th Dec, 1999
  • Saba Power 126 MW commissioned on 31st Dec, 1999
After the 18th amendment in the constitution , power generation is now a provincial matter. What are the efforts of PMLN lead Punjab govt. in this regard will be presented in the sequel of this blog post, and will be posted soon.