Chinese President visit

Prime Minister Muhammad Nawaz Sharif hand shake with Chinese President.

Democracy WINS - Pakistan WINS!

Wall street Journal news about democratic Pakistan

PCEC map

This is the original and only map of PCEC.

Mass Transit Bus Projects

Rawalpindi Metro Project

PM meets King Salman

Pakitan stands beside Saudia for its soverignity

Reduction in fares of public transport

Toll free helpline for compaints

Parliament Gallery

Group Photo| Speaker NA Sardar Ayaz Sadiq with Dr. Cyrill Nunn, Ambassador of Germany and Members of Pakistan-Germany Parliamentary Friendship Group

News reel

Followers

Showing posts with label LNG. Show all posts
Showing posts with label LNG. Show all posts

Wednesday, June 10, 2015

Oil output expected to rise to 40m barrels next year

 Oil output expected to rise to 40m barrels next year

 Keeping in view the expected supply of domestically produced oil at only 110,000 barrels per day and 1.5 trillion cubic feet of gas, the gap between supply and demand is required to be met through imports. STOCK IMAGE
The government has set the production target for crude oil at 40 million barrels for the next financial year, an increase of 12% over the goal for the outgoing year.
This year, the target is 35.62 million barrels and actual production is likely to be 35 million barrels by the end of the year on June 30, which is 98% of the output the government expected to achieve.
In 2014-15, maximum crude oil production per day is 100,000 barrels per day and the government plans to increase it to 110,000 barrels per day in the next financial year, beginning July.
For gas production, the target has been set at 1.5 trillion cubic feet for the next financial year, which is only 2% higher than the target of 1.470 trillion cubic feet for the outgoing year. Actual output this year is expected to be 1.460 trillion cubic feet, hitting 99.32% of the goal.
Oil and gas exploration companies are planning to drill 126 wells to meet the target for the next year.
According to the Annual Plan 2015-16, next year the demand is projected to stand at 23 million tons of oil (473,000 barrels per day) and 2.1 trillion cubic feet of gas (six billion cubic feet per day).
Keeping in view the expected supply of domestically produced oil at only 110,000 barrels per day and 1.5 trillion cubic feet of gas, the gap between supply and demand is required to be met through imports.
About 18 to 19 million tons of crude oil and petroleum products will be imported while domestic gas supply will be supported through import of 400 million cubic feet of liquefied natural gas (LNG) per day. This will result in bridging to some extent the gap of over two billion cubic feet of gas per day.
A positive feature for the energy sector in the past one year had been a sharp decline in international crude prices, which triggered a 29% fall in domestic petroleum product prices. With this, costs of transport and electricity generation have also gone down.
In an effort to enhance the exploration and production of oil and gas, a study on shale oil and gas deposits is being conducted with financial assistance of the US Agency for International Development (USAID) and it is expected to be completed by the end of 2015.
The study will give an assessment and allied aspects of shale oil and gas resources in the country, paving the way for development of a comprehensive and investment-friendly shale oil and gas policy.
In order to extend their network in 2014-15, gas utilities – Sui Northern Gas Pipelines Limited (SNGPL) and Sui Southern Gas Company (SSGC) – laid 6,799 km of new transmission and distribution pipelines to provide gas to 418,410 new consumers.
Next year, they plan to add a further 419,430 consumers by laying 7,332 km of new transmission and distribution pipelines.
Published in The Express Tribune, June 9th, 2015.




Sunday, February 2, 2014

Nawaz, Zardari launch Thar coal power project

 Nawaz, Zardari launch Thar coal power project


THAR: Prime Minister Nawaz Sharif and former president Asif Ali Zardari Friday jointly performed ground-breaking of the US 1.6 billion dollar Thar coal power project to help the country meet its energy needs.
The project, scheduled to complete in 2017, will initially provide 660 MW of power for Pakistan's energy starved industrial units.
The project will be carried out by Sindh Engro Coal Mining Company (SECMC) — a joint venture between Engro Powergen and Government of Sindh.
Prime Minister Sharif, in his address, said the launch of the project along with Zardari, had sent a message across that the political leadership should be united when it comes to the development of the country.
He said this political trend must be set in Pakistan now and the leaders need to think about the country first regardless of their differences.
He thanked Zardari for inviting him to the ground-breaking of the project and said it was a matter of satisfaction that “we all are together and have the same priorities”.
Prime Minister Sharif termed the Thar coal project a big national development project and suggested that the coal for all projects in Gaddani should be supplied from Thar.
He said the government was working on several power generation projects including hydel and nuclear generation.
The prime minister also said the recently launched nuclear power project in Karachi would generate 2200 MW, while the Dasu, Diamir and Bunji dams on Indus River would generate 15000 MW electricity. He said the Thar coal project would eventually produce 6600 MW of power.
The prime minister said three power projects would complete in 2017, including the Jhimpir Wind Power project in Thatta, CASA 1000 and Tarbela Dam upgradation.
He said efforts were afoot to import Liquified Natural Gas (LNG) and pledged that in a year and a half, the country’s gas shortage problem would be addressed.
Prime Minister Sharif said the project will usher in an era of prosperity and development for the people of Tharparkar.
He also seconded former president Zardari’s suggestion for setting up an industrial park in Thar that would generate employment for the people. He said the federal government would contribute in its development.
Zardari said the day's event would convey a message to the next generations of the country that the politicians need to sit together to work for the development of the country.
He said the project, initiated by Benazir Bhutto and later pursued during his government, had finally seen the light of day.
Chief Minister Sindh Qaim Ali Shah said the project would bring about a big change in the lives of the people of Tharparkar, Sindh and the entire country.
He termed the coal as gold for Pakistan and said the electricity generated would be used to help run the industrial units of the country and generate employment.
The project in Block-II of Tharparkar District is spread over an area of 79.6 square kilometres. According to a feasibility study, the project is commercially viable and has no significant environmental threats and social implications.
In its first phase, the project will develop a coal mining and power project with a capacity of 3.8 million tonnes per annum and 660 MW.
Subsequently, the mine will be expanded to a coal capacity of 6.5 million tonnes per annum to support a 1300 MW power plant.
In the second phase, it is planned to expand mining project to 13.5 million tonnes and 19.5 million tonnes, with a power generation capacity of 2400 MW and 3600 MW.
The Thar coal field has an estimated lignite reserves of 175 billion tonnes, equivalent to the total oil reserves of Saudi Arabia and Iran combined and can be used to produce 100,000 MW for 200 years, according to the data available by SECMC.